159
Opening. The estimates for most of these are given in detail, the designs of those not given in detail have not been settled yet.
A rather large over bridge is No. 2 where Des Voeux and Gascoigne Roads meet and are taken over the Railway by a Skew Bridge. As originally arranged by Mr. Bruce this bridge was a very wide one, but I managed to obtain sanction for greatly reducing the width, but even now I think it is unnecessarily large.
None of the Major Bridges will give any difficulty I hope. Bridge No. 25 at the South End of Taipo Station will require Well foundations. I propose to use wooden curbs made locally and make each pier and pier abutment of two 14' drain wells sunk about 2 or 3 feet apart, 25 feet into the sand. I had bore holes sunk and could get nothing but sand.
The estimate for Bridge No. 30 is rather large, but I think I will be able to cut out one span. I am watching the floods in this valley, but I think that the tide is the ruling factor here.
The last bridge over the Sam Chun River at Lo Fu consists of 100 feet Deck Span Girder with one 20' span at each side. The banks of this river are very well defined and steep, and the water is rather deep. I did not think it advisable to put a pier in the centre as it would necessitate a rather large cofferdam, which would block up the channel very much during construction. This would be a serious matter as the river is tidal and liable to heavy floods besides. The boundary line between British and Chinese Territory is the high water mark on the North side of the river, so I am proposing that the Chinese Section should pay for the North abutment and 20 feet span, while the British Section pay for the South Abutment, 20 feet and 100 feet span. I have included the cost of the whole bridge, however, in the estimate.
Minor Bridges do not call for much remark.
159
Jyub luni ni oqiT sen nerasit. «fo er no drowned
· · · ·
10 bala deo zineant à ..
...ami[ một no xrow tel 10 off at [II nonusť rebau eko ental NOT
.ubeol Houthi (snsvng Meraun mente at elit eteritas BIT
- hos dors va tent 000, I JuoɗA
for univit a vino a dean arið,boutI vfivt as batsmiteo
wal 90 03 bar sensoxe to Iseb dasta A
S LEA .aṣost dod Je revet caulens moitRADATĘ # as be¬uo-
od 18 bantent of of ba anola III era wob "ukumu ats/Jum
robou ozla obič otrok era JĂ .qu her(I? atstew dond has aloog
* "rolo w ni stopit10 IsothaM and vď novłą wolyha
o bet mit svoda neot (I si no banalq need sved aretiSKO
„Egunum að ætinocgo vellav and to mhle erit no bsoft reijnor¶
and to stand redek dude) and evoda #Ilmi ad axotunun add del
Iesknd not bebivono at walegon ESÄNDÅ NÅ #dro reto nooiwa){
.adˆor ert mort har of nga mið
1
OW SIB T
násgol ni Jent 000 to eno
I pablovs en Yam qnol feet 00% femrud troda ofT „outet is
.shar et midano fogo qe ed In Jav as mistreɔ ton ma
hive of aber at onlar te lennut, ONT
VIHY A MO Bound .~k vt duo blaf as breiben a box malamım
ehlova oele foongi see "pixel .oydo qiana reddet bra mnol
vahi Bone O Yews aroh bas 19t6w qoob reddet nå vad 8 BRİNBOTO
.nambind FIDITTib torten emon to
arofarsvin a babylont et abe A rabun
nanя zelmont suit,noolweX ti abso♬ emtooand bra xunov and to
9 je bson ense ord bus ad-oI NOI to enaŘIIV BEJ 158"
moldata oqist to bat
brord 'an at an hink to vanoner $10
seabirЯ
O nevo to a
.enil sforia TO? TOW нo*I hпn exil eldnob rot
jim kolum 21 ore 9137T
feet opening. The estimates for most of these are given in detail, the designs of those not given in detail have not been
settled yet.
A rather large over bridge is No. 2 where Des Voeux and Gascoigne Roads meet and are taken over the Railway by a Skew Bridge. As originally arranged by Mr. Bruce this bridge was very wide one, but I managed to obtain sanction for greatly reducing the width, but even now I think it is
unnecessarily large.
None of the Major Bridges will give
any difficulty I hope. Bridge No. 25 at the South End of Taipo Station will require Well founds. I propose to use wooden curbs made locally and make each pier and pier abutment of two 14' drain wells sunk about 2 or 3 feet apart 25 foet into the sand. I had bore holes sunk and could get nothing but sand.
The estimate for Bridge No. 30 is
rather large, but I think I will be able to cut out one span. I am watching the floods in this valley, but I think that the
tide is the ruling factor here.
The last bridge over the Sam Chun
River at Lo Fu consists of 100 feet Deck Span Girder with one 20' span at each side. The banks of this river are very well defined and steep and the water is rather deep. I did not think it advisable to put a pier in the centre as it would necessi- tate a rather large cofferdam, which would block up the channel very much during construction. This would be a serious matter as the river is tidal and liable to heavy floods besides. The boundary line between British and Chinese Territory is the high water mark on the North side of the river, so I am pro- -posing that the Chinese Section should pay for the North abutment and 20 feet span, while the British Section pay for the South Abutment, 20 feet and 100 feet span. I have included the cost of the whole bridge however in the estimate.
Minor Bridges do not call for muchi
remark